Saturday, September 3, 2011

Benchwork for the Lower Tier Completed!

A few weeks ago, I completed the construction of the lower tier of my "Redwood Empire Route" - NWP HO scale layout. The layout takes up about half of my two-car garage. I have even installed the Masonite backdrop material for the lower tier. The next step is for me to fill in the screw holes and paint it a Sky Blue paint. Once this is done, I will be able to start laying some of the subroadbed material and Atlas Code 83 flex track. Be sure to check out some of the other pages of this blog to see some pictures of the benchwork and backdrop being installed.

No comments:

Post a Comment